The stadium hosted Six Nations matches for greater than a decade, however has been deserted and left to fall into disrepair since Italy’s departure in 2012

An aerial view of Flaminio Stadium in Rome (Picture: Stefano Costantino/SOPA Pictures/LightRocket through Getty Pictures) This text accommodates affiliate hyperlinks, we’ll obtain a fee on any gross sales we generate from it. Study extra
Italy’s Stadio Flaminio, which as soon as hosted Six Nations matches for over a decade, now lies derelict and decaying. The Rome-based venue has fallen into disrepair.
The 30,000-seater stadium first opened its doorways in 1959, in-built anticipation of the 1960 Summer time Olympics. Though primarily a soccer floor, it grew to become dwelling to rugby union in 2000, marking Italy’s entry into the Six Nations Championship.
All through its operational years, it remained the event’s most intimate venue, however was finally thought of insufficient when Italy moved their main worldwide matches to the significantly bigger Stadio Olympico close by. Greater than ten years after Italian rugby vacated the bottom in 2012, the stadium stays dilapidated, though there are tentative plans for its revival.
Wales first visited the stadium in April 2001, twelve months after Italy joined the Six Nations. The Welsh aspect secured a 33-23 triumph, with Gareth Cooper touching down as soon as and Scott Gibbs including two tries to seal victory.
Within the years that adopted, Wales – whose newest loss to Italy grew to become the catalyst for Warren Gatland’s departure as head coach – loved blended success within the Italian capital.
“Now, we’ll work to look at it intimately. It appears that evidently Lazio has moved from intentions to will to concrete information. From right here to a couple hours we anticipate that what they offered to us, additionally with video, will change into an official request with all the mandatory documentation.”
In the course of the membership’s 126th anniversary celebrations earlier this yr, Lotito declared that the £370million challenge to rebuild the stadium is a ‘high precedence’, including that three years represents a ‘affordable timeframe’ to start development.

















Leave a Reply